Project Stats
Location
Makkah
Land Area
26,745 m²
Project Category
- Transportation
Sector
Transportation
Client
Saudi Spanish Train project co.
The SCADA solution for the King Abdulaziz International Airport Station for the Saudi Railway Company is a reliable and efficient railway tunnel control system. It was implemented as a comprehensive system for the railway tunnel leading to the King Abdulaziz International Airport Station in Jeddah. This project contributed to enhancing safety and efficiency by:
- Real-time monitoring and control: PLC based SCADA system to manage ventilation, pumping, lighting and load shedding.
- Sensor integration: Enhanced proactive maintenance (Access Point Sensor, Schneider PM5320, WAGO IE switches, MRMU ION6200).
- High system reliability: Backup servers and workstations for continuous operation.
- User-friendly interface: Seamless monitoring and control via intuitive GUI.
- Main results: Improve safety, enhance efficiency, reduce operating costs, and data-driven maintenance.
Gallery